2. Chimney 2.1 The chimney is placed directly on the roof flange of the body. 2.2 Asbestos rope is embedded in the flange joint, and air leakage is not allowed. At the highest point of the chimney, three ropes with approximately the same degree of tension are installed. 2.3 The height of the smoke from the surrounding buildings should be set at the end of the chimney.
  3. Boiler 3.1 The boiler should be installed vertically. 3.2 After the boiler is installed, the horizontal error of the furnace top is not more than 0.9 mm.  3.3 The water level of the atmospheric boiler is full.
4. Influent water 4.1 According to the specific conditions, the user can use the water tank or pipeline to feed the water pump. 42 A pressure gauge should be installed on the pipe between the check valve and the feed water pump to observe the water supply pressure. 4.3 The arrangement of the water supply pipeline shall ensure that the passage is unblocked.
 5. Drainage 5.1 Each boiler should be equipped with a separate sewage pipe. 5.2 The connection between the sewage pipes should be flanged or threaded, and the elbows should be minimized to ensure smooth discharge. The sewage pipe should be inclined in the direction of discharge. 5.3 The sewage pipe shall be connected to a safe place outside the boiler room.
  6. Oil supply 6.1 Oil is supplied to the burner through the medium tank. The user can use the neutral tank to supply oil, and can also manually refuel the neutral tank at any time. There are two ways to connect the 6.2 media tank to your burner. One is the pumping system at the bottom of the tank; the other is the oil suction method. 6.3 Install a filter with a mesh size of 250 mesh/inch at the outlet of the tank or at the inlet of the burner inlet. 6.4 The oil supply pipe should be airtight before the installation, and the pressure should be 0.7-1.6Mpa.
  7. Burner 7.1 To ensure the horizontal level of the furnace, the horizontal error is not more than 0.9 mm, which can prevent the burner from being skewed after installation. 7.2 The front end of the burner flange shall be fitted with a heat insulation mat to prevent damage to the burner caused by the overflowing hot gas. 7.3 The burning head should extend out of the burner to take about 10.5 mm. 7.4 The back of the burner should be mounted about 3.5 mm high to prevent fuel deposits on the back. 7.5 For the first use of the burner and after each cleaning of the oil filter or loosening the oil pipe, exhaust work is required. See section l.7 for details, and daily operations are not necessary.