Indications for the Second Tender of the Standardization Construction Project for Village-level Organizational Activity Sites in Mozhugongka County (15 Villagers' Committees, Longda Village, Jiama Township)

Indications for the Second Tender of the Standardization Construction Project for Village-level Organizational Activity Sites in Mozhugongka County (15 Villagers' Committees, Longda Village, Jiama Township)

(Tender No.: HNFD—XZ—201701)
I. Bidding conditions The standardization construction project of the village-level organization activity venues of the Mozhugongka County (15 village committees, including Longda Village, Jiama Township) has been approved by the Mozhugongka County Development and Reform Commission with a letter of Mofa (2016) No. 491. . The bidding documents have been filed with the competent authority of the industry and the record number is LS2016391. The bidder is Lhasa City Urban Construction Investment Management Co., Ltd. The project has already met the conditions for bidding. The construction bid section of the project is now open to domestic bids.
II. Project overview and scope of tender
1. Project nature: New construction.
2. Bid Section Division and Bidding Contents: The project is divided into a bid section, and the construction project of the village-level organization activity venues in Mozhugongka County (15 neighborhood committees in Longma Village, Jiama Township).

No. Name of Township Village Name Construction Scale (Total Floor Area)
Construction Content
1

Rendogang Village Committee
787.12 square meters of new office dormitory building 11,129.27 square meters, warehouse, bathhouse 601.2 square meters, dry toilet 201.7 square meters, overall project and equipment purchase.
2
Dezhong Village Committee
608.85 square meters
3
Bolang Village Committee
682.43 square meters
4
Longda Village Committee
929.57 square meters
5

Zha Xuexiang

Milo Village Committee
826.65 square meters
6
Zha Xue Village Committee
826.65 square meters
7
Gelawo Village Committee
826.65 square meters
8
Taj Village Committee
762.84 square meters
9
Zhaxi Gang Xiang Ji Gu Village Committee
833.04 square meters
10
Longerin Village Committee
833.04 square meters
11
Galdo village committee
833.04 square meters
12
Barlow Village Committee
826.65 square meters
13

Ladong Village Committee
929.57 square meters
14
How Many Villages in Japan
826.65 square meters
15
Lalong Village Committee
599.42 square meters

(Note: The above building area is approved by the budget estimate, and the actual construction area is based on the drawings.)
The scope of the tender includes all the contents contained in the construction drawings and the bill of quantities.
3. Construction site: Mozhugongka County;
4. Sources of funding and implementation: State investment, funds have been implemented;
5. Plan duration: 90 calendar days (effective duration); no winter break.
6, project quality requirements: qualified.
Third, bidder qualification requirements:
1. The bidders for each bid section of the project must be an independent legal person with the qualifications of the general construction contracting (including grade) of the building construction project issued by the construction administrative department, with a good reputation and a valid record of bribery crimes. It has relevant construction capabilities in terms of personnel, equipment, funds, etc.; the bidder proposes that the construction engineer must possess the professional qualifications for registered construction divisions (including Grade II) and above, intermediate and above engineering and technical titles, and effective safety. Production evaluation certificate, and did not act as project manager for other projects under construction;
2. According to the requirements of Document No. 119 (2013) of the Tibet Autonomous Region, and the document No. 85 (2011) of the Tibet Construction and City Management Bureau (2011); (The filing shall be filed within the validity period of the application).
3, this tender does not accept the Commonwealth bid;
4. Companies that have bad records and are in the public notice period may not register.
IV. Bid Registration and Invitation for Bidding Documents Interested bidders wishing to participate in this project are invited to register and download the tender documents and construction drawings from March 14, 2017 to March 20, 2017. The price of each set of tender documents is RMB 850.00 ( RMB) will not be refunded after sale.

Cable Protection Sleeve

Specifications of Cable Protection Sleeve For Copper Wire

1.Copper filament material
2.Good EMI shielding
3.Cut and abrasion resistant
4.Flexible&easy to install

EMI shielding Copper foil braid sleeve woven tube

Flame Retardant Insulation Tinned Copper Braided Sleeving

Metal and Shielding Braided Tinned Copper Expandable Sleeving

· Multi-purpose metal braid provides shielding and grounding for equipment or wire harnesses , to protect your investment

· Aesthetically pleasing design is commonly used to decorate or conceal hoses and wires in automotive applications

· Expandable design allows for quick and easy installation of cable or wire bundles

· Quality tinned copper braid can be easily soldered to connectors and used for custom-length earth straps

· Resists chemicals and the elements for use in rugged or exposed applications

· Durable construction provides superior protection from accidental cuts or consistent abrasion

· Easily cuts with shears, however heat shrink or electrical tape is recommended to terminate ends, to prevent them from fraying.





Copper Sleeve For Shielding Grounding ,Copper Foil Sleeve,Copper Sleeve For Shielding,Tin Copper Sleeve For Wire Conductor

Shenzhen Huiyunhai Tech.Co.,Ltd , https://www.hyhbraidedsleeve.com